House owners can get up to 28 thousand. PLN in the program “My current 6.0”. The recruitment lasts only until October 31 or until the funds last.
Poles can still use the “My current 6.0” program, but there is less and less time. The National Fund for Environmental Protection and Water Management reminds that the call for applications will last only until October 31, 2025, and the budget – PLN 1.8 billion – has already been used in over 80 percent. This means that both the date and financial resources can end faster than the schedule assumes.
For whom for surcharges?
“My electricity” is a program addressed to prosumers, i.e. people producing energy for their own needs. The main goal is to increase the use of photovoltaics and to promote auto -consumption. Therefore, subsidies include not only PV installations, but also energy and heat warehouses.
The total amount of co -financing can amount to a maximum of 28 thousand. PLN and cover up to 50 percent eligible costs. The amount of support depends on the type of investment:
- photovave micro -installation – up to 7,000 PLN, if the project includes a energy or heat warehouse; up to 6,000 PLN, if it does not include warehouses (for installations reported until July 31, 2024),
- heat – up to 5,000 PLN with a minimum capacity of 20 dm³,
- electricity warehouse – up to 16 thousand PLN with a capacity of at least 2 kWh.
From August 2024, the principle applies that the applicant for co -financing solar farms must invest in a energy or heat storage at the same time. Installations must have a power of 2 to 20 kW.
How to submit an application?
Applications can only be submitted online through the generator of applications for co -financing (GWD). It is required to set up an account using a trusted profile or e-edge, and then attach documents in electronic form. NFOŚiGW contacts the applicants by e -mail – also on amendments. In this edition, a maximum of four corrections are possible, which is to improve the whole process.
Statistics show that over 40 percent requires supplementation. The most common errors apply to documentation. Invoices must be supplemented with name confirmation of payment, and not just the annotation “paid”. It is also necessary to certify the network operator about connecting the installation and a receipt protocol in the case of warehouses. The application can only be submitted after the investment is completed and paying all invoices.